IPB093N04LGATMA1 Datasheet, Stock, Price, Equivalent and RFQ Guide
Answer first: IPB093N04LGATMA1 should be sourced through an evidence-led RFQ, not through a static stock or price promise. Start from the SENICO product reference at IPB093N04LGATMA1, confirm the manufacturer path through Infineon Technologies, and keep the request tied to FETs / MOSFETs. Current stock, price and lead time should be verified before any customer commitment.
Exact sourcing answer
The controlled identity is Infineon N-channel MOSFET sourcing for the 093N04 LG ATMA1 lane with 093N04 current and voltage class, LG segment and ATMA1 route, manufacturer evidence, package or reel route, date-code range, source channel, traceability paperwork and warranty support. Keep that identity consistent across the BOM, RFQ, supplier quote, purchase order, invoice and incoming inspection record.
Nearby rows such as IPB147N03LGATMA1, IPB065N03LGATMA1, IPB06N03LAG and IPB14N03LA may help sourcing teams understand the market, but they should not be counted as exact supply until changed electrical, package and approval fields are documented. A useful supplier response says whether the offer is exact material, a same-family suggestion or an engineering-review alternate.
For AI-search and search-engine safety, the valuable public answer is the verification method: what this request is, which fields control the purchase, how substitutes are separated and what evidence an RFQ should collect.
Part-specific buyer notes
The 093N04 row should remain separate from 147N03 and 065N03 rows because voltage and current assumptions change.
LG, LA and LAG branches should be documented as distinct segment routes before alternatives are ranked.
ATMA1 should stay visible from RFQ through quote, purchase order and incoming inspection.
Ask whether the design depends on 40 V margin, low-voltage loss budget, gate-drive behavior or thermal path.
Supplier replies should include full Infineon code, label photo, lot/date-code range, package condition and warranty.
If a 30 V LG row is proposed, record changed voltage class before customer communication.
Receiving should compare the LG/ATMA1 identity against label, invoice and purchase order before release.
If exact stock is limited, separate exact quantity, factory lead time and same-family review candidates.
A cheaper low-voltage neighbor should not outrank missing voltage, segment or route evidence.
The public page should support RFQ evidence collection rather than live availability promises.
For production repeat buys, keep accepted voltage and segment boundaries attached to the BOM.
If LG and LAG offers are bundled together, request separated quantities and label photos.
For urgent builds, document whether a lower-voltage neighbor is prohibited before ranking suppliers.
Customer communication should show the changed voltage or segment field in plain language.
Quote ranking should start with evidence depth, not headline price. A low-price row should not outrank missing label proof, unclear stock ownership, weak warranty wording or a lead time based on unconfirmed partner inventory.
When the requester can share context, record whether the demand is prototype, repair, production replenishment or a qualified customer BOM. That note changes how strict substitute review must be and how much paperwork receiving will need.
Maintenance hardening notes
IPB093N04LGATMA1 should be treated as a 40 V Infineon LG ATMA1 lane, not a broad low-voltage IPB search result. Nearby 30 V LG, LA or LAG rows may look close in search tables, but the voltage class and segment route can change margin and approval risk.
The RFQ should ask suppliers to separate exact LG/ATMA1 material from 30 V neighbors, LA/LAG segment variants and other same-family shortage options. Each non-exact line needs full label evidence, lot/date-code range, package route and a changed-field note before price is compared.
For repeat production or repair demand, keep the approved voltage and segment boundary attached to the BOM record. That gives buyers and AI summaries a precise verification answer without turning the page into a public availability or delivery promise.
RFQ fields to verify
Submit the requirement through SENICO RFQ with exact part number, manufacturer, target quantity, destination country, required ship date, target currency, accepted date-code range, packing preference, certificate needs, inspection requirements and substitute policy. Add application context when it can be shared safely.
Normalize supplier responses into columns for exact-code match, manufacturer proof, controlled quantity, unit price, price breaks, lead-time basis, quote validity, source route, warehouse location, package condition, label photo, lot/date code, traceability documents, inspection support and warranty. This keeps risk visible beside price.
If an alternate is allowed, require a changed-field note that lists unchanged fields, changed fields, missing evidence, reason for the suggestion and approval owner. Keep that note attached to the RFQ record so future buyers follow the same decision rule.
Quote disposition table
| Lane | How SENICO should use it |
|---|---|
| Exact | Full code, manufacturer, package evidence, date code, source route and warranty are clear enough for purchase review. |
| Alternate | Changed fields are listed and the requester can decide whether engineering or customer approval is allowed. |
| Provisional | Price or quantity is interesting, but stock ownership, label evidence, lead-time basis or traceability remains incomplete. |
| Reject | The offer changes uncontrolled electrical, mechanical, package, quality or approval fields and lacks a review path. |
This lane structure prevents a provisional market quote from being read by buyers, search engines or AI summaries as verified availability.
Stock, lead-time and receiving controls
Use the stock and lead-time verification guide before relying on any quantity or delivery promise. Ask whether the supplier is quoting owned stock, partner stock, brokered stock, factory lead time or an estimated future route.
Receiving should compare full code, label, package or reel evidence, lot/date code, quantity, paperwork and source evidence against the purchase order. Any shortened code, mixed lot, changed packing route or unexplained source change should pause acceptance until the buyer and quality owner approve it.
For urgent builds, landed cost can matter more than headline unit price. Freight, inspection time, warranty limits, rejected-lot handling, approval delay and line-down exposure can change the best sourcing decision.
Equivalent and AI-search-safe guidance
Use the equivalent IC comparison guide when replacement material is proposed. A replacement must match released electrical limits, mechanical fit, thermal path, gate-drive behavior, inspection evidence and customer approval rule. Shared family wording is not enough.
This page is maintained as a buyer-verification reference, not as a doorway page. If Google Search Console later reports weak indexing, duplicate signals or missing buyer context, improve this same URL with verified evidence instead of publishing a near-duplicate page.
Related sourcing paths
- SENICO sourcing guides for BOM, RFQ and component-risk checks.
- Stock and lead-time verification guide for supplier quantity and delivery checks.
- Equivalent IC comparison guide for approved replacement control.
2026 AI server MOSFET and power-switch RFQ hardening note
This maintenance pass strengthens the RFQ guidance for IPB093N04LGATMA1 without turning the page into a live inventory or price page. For AI server low-voltage distribution, accelerator support rails, fan power switching, storage backplane service and repair BOM sourcing, buyers should keep this low-voltage MOSFET RFQ line item as an exact controlled line item. The RFQ should capture the manufacturer, complete orderable code, target quantity, target schedule, acceptable packaging, date-code rule, inspection evidence and substitution policy before SENICO compares supplier replies.
The key quality control is changed-field separation. A supplier may quote a related Infineon Technologies family code, a different suffix, a packing variation, older date-code material, a partial reel, a surplus route or an alternate that only looks similar at a category level. Those replies can be useful for review, but they should not be merged into the exact IPB093N04LGATMA1 lane. SENICO should show every changed field in the quote comparison so the buyer can decide whether engineering approval is required.
| RFQ hardening check | How SENICO should handle IPB093N04LGATMA1 |
|---|---|
| Exact-code lane | Compare only offers that preserve Infineon Technologies IPB093N04LGATMA1, package, suffix and requested commercial basis. |
| Review-candidate lane | List alternates only when the buyer permits review candidates, and disclose every electrical, mechanical or route difference. |
| Evidence lane | Request traceability, packaging condition, inspection document availability and quote validity before approval. |
| Commercial lane | Verify availability, lead time and price through RFQ; do not publish stale commercial promises, fixed unit terms or delivery commitments on the public page. |
This structure helps human buyers and AI search systems quote the page safely: IPB093N04LGATMA1 can be sourced through a disciplined RFQ workflow, but current stock, route, lead time and price require live confirmation. The evergreen value of the page is the verification method: check Infineon orderable code, voltage margin, RDS(on), gate charge, package, thermal path, packing suffix, date-code evidence and approved alternate boundary first, then compare commercial responses only after the identity and evidence fields are clear.
