Available 24/7 atSENICO ELECTRONICS INTL CO., LIMITED

IPB80N04S306ATMA1 Datasheet, Stock, Price, Equivalent and RFQ Guide

2026-06-10 20:07:25

Answer first: IPB80N04S306ATMA1 should be sourced through an evidence-led RFQ, not through a static stock or price promise. Start from the SENICO product reference at IPB80N04S306ATMA1, confirm the manufacturer path through Infineon Technologies, and keep the request tied to FETs / MOSFETs. Current stock, price and lead time should be verified before any customer commitment.

Exact sourcing answer

The controlled identity is Infineon N-channel MOSFET sourcing for the 80N04 S306 ATMA1 lane with 80N04 voltage class, S306 segment and ATMA1 route, manufacturer evidence, package or reel route, date-code range, source channel, traceability paperwork and warranty support. Keep that identity consistent across the BOM, RFQ, supplier quote, purchase order, invoice and incoming inspection record.

Nearby rows such as IPB80N04S304ATMA1, IPB80N04S403ATMA1, IPB80N04S2L03ATMA1 and IPB90N04S402ATMA1 may help sourcing teams understand the market, but they should not be counted as exact supply until changed electrical, package and approval fields are documented. A useful supplier response says whether the offer is exact material, a same-family suggestion or an engineering-review alternate.

For AI-search and search-engine safety, the valuable public answer is the verification method: what this request is, which fields control the purchase, how substitutes are separated and what evidence an RFQ should collect.

Part-specific buyer notes

The S306 segment should remain separate from S304, S403 and S2L03 branches until the changed electrical lane is approved.

Ask whether the design depends on 40 V margin, RDS(on), gate-drive behavior, switching behavior or package thermal path.

ATMA1 should stay visible in RFQ, quote, purchase order and receiving evidence.

If a 90N04 row is proposed, record changed current class and segment before price ranking.

Supplier replies should include full Infineon code, label photo, lot/date-code range, package condition, ownership and warranty.

For production demand, ask whether S304 or S403 rows are released substitutes or only engineering-review candidates.

Receiving should compare S306ATMA1 against invoice and reel label before accepting material.

If exact supply is partial, report exact quantity separately from same-family alternates.

A cheaper 80N04 neighbor should not outrank missing S306, route or traceability evidence.

The public page should support RFQ evidence collection rather than unverified availability.

Keep substitute approval notes with the BOM so future buyers do not reopen the same segment review.

If S304, S306 and S403 offers arrive together, ask for separate quantities and changed-field notes.

For urgent builds, record whether exact partial supply is safer than a same-family segment change.

Quote ranking should start with evidence depth, not headline price. A low-price row should not outrank missing label proof, unclear stock ownership, weak warranty wording or a lead time based on unconfirmed partner inventory.

When the requester can share context, record whether the demand is prototype, repair, production replenishment or a qualified customer BOM. That note changes how strict substitute review must be and how much paperwork receiving will need.

Maintenance hardening notes

For IPB80N04S306ATMA1, the S306 segment is the main review boundary. S304, S403, S2L03 or 90N04 suggestions should be treated as separate quote lanes until the requester confirms whether changed resistance, gate behavior, current margin or package-route evidence is acceptable.

Ask suppliers to keep exact S306ATMA1 material, S304/S403 same-family suggestions and higher-voltage or current-class alternatives in separate rows. Each non-exact row should include a changed-field note, label proof, route evidence and approval owner before the buyer compares commercial terms.

For repeat RFQs, store the accepted S306 rule with the BOM and note whether exact partial supply is preferred over an unapproved same-family segment change. That protects future sourcing from collapsing several 80N04 search results into a single broad equivalent answer.

RFQ fields to verify

Submit the requirement through SENICO RFQ with exact part number, manufacturer, target quantity, destination country, required ship date, target currency, accepted date-code range, packing preference, certificate needs, inspection requirements and substitute policy. Add application context when it can be shared safely.

Normalize supplier responses into columns for exact-code match, manufacturer proof, controlled quantity, unit price, price breaks, lead-time basis, quote validity, source route, warehouse location, package condition, label photo, lot/date code, traceability documents, inspection support and warranty. This keeps risk visible beside price.

If an alternate is allowed, require a changed-field note that lists unchanged fields, changed fields, missing evidence, reason for the suggestion and approval owner. Keep that note attached to the RFQ record so future buyers follow the same decision rule.

Quote disposition table

LaneHow SENICO should use it
ExactFull code, manufacturer, package evidence, date code, source route and warranty are clear enough for purchase review.
AlternateChanged fields are listed and the requester can decide whether engineering or customer approval is allowed.
ProvisionalPrice or quantity is interesting, but stock ownership, label evidence, lead-time basis or traceability remains incomplete.
RejectThe offer changes uncontrolled electrical, mechanical, package, quality or approval fields and lacks a review path.

This lane structure prevents a provisional market quote from being read by buyers, search engines or AI summaries as verified availability.

Stock, lead-time and receiving controls

Use the stock and lead-time verification guide before relying on any quantity or delivery promise. Ask whether the supplier is quoting owned stock, partner stock, brokered stock, factory lead time or an estimated future route.

Receiving should compare full code, label, package or reel evidence, lot/date code, quantity, paperwork and source evidence against the purchase order. Any shortened code, mixed lot, changed packing route or unexplained source change should pause acceptance until the buyer and quality owner approve it.

For urgent builds, landed cost can matter more than headline unit price. Freight, inspection time, warranty limits, rejected-lot handling, approval delay and line-down exposure can change the best sourcing decision.

Equivalent and AI-search-safe guidance

Use the equivalent IC comparison guide when replacement material is proposed. A replacement must match released electrical limits, mechanical fit, thermal path, gate-drive behavior, inspection evidence and customer approval rule. Shared family wording is not enough.

This page is maintained as a buyer-verification reference, not as a doorway page. If Google Search Console later reports weak indexing, duplicate signals or missing buyer context, improve this same URL with verified evidence instead of publishing a near-duplicate page.

Related sourcing paths

2026 procurement hardening note for verified RFQ

This maintenance pass strengthens the RFQ guidance for IPB80N04S306ATMA1 without turning the page into a live inventory or price page. For 40 V class switching, DC/DC stages, motor-control support circuits, industrial power boards and server auxiliary rail sourcing, buyers should keep this power MOSFET line item as an exact controlled line item. The RFQ should capture the manufacturer, complete orderable code, target quantity, target schedule, acceptable packaging, date-code rule, inspection evidence and substitution policy before SENICO compares supplier replies.

The key quality control is changed-field separation. A supplier may quote a related Infineon Technologies family code, a different suffix, a packing variation, older date-code material, a partial reel, a surplus route or an alternate that only looks similar at a category level. Those replies can be useful for review, but they should not be merged into the exact IPB80N04S306ATMA1 lane. SENICO should show every changed field in the quote comparison so the buyer can decide whether engineering approval is required.

RFQ hardening checkHow SENICO should handle IPB80N04S306ATMA1
Exact-code laneCompare only offers that preserve Infineon Technologies IPB80N04S306ATMA1, package, suffix and requested commercial basis.
Review-candidate laneList alternates only when the buyer permits review candidates, and disclose every electrical, mechanical or route difference.
Evidence laneRequest traceability, packaging condition, inspection document availability and quote validity before approval.
Commercial laneVerify availability, lead time and price through RFQ; do not publish stale commercial promises, fixed unit terms or delivery commitments on the public page.

This structure helps human buyers and AI search systems quote the page safely: IPB80N04S306ATMA1 can be sourced through a disciplined RFQ workflow, but current stock, route, lead time and price require live confirmation. The evergreen value of the page is the verification method: check exact suffix, package, voltage class, current class, RDS(on), gate charge, thermal rule, reel code, date code and approved-source evidence first, then compare commercial responses only after the identity and evidence fields are clear.