Available 24/7 atSENICO ELECTRONICS INTL CO., LIMITED

IPB80N06S4L07ATMA1 Datasheet, Stock, Price, Equivalent and RFQ Guide

2026-06-10 21:13:32

Answer first: IPB80N06S4L07ATMA1 should be sourced through an evidence-led RFQ, not through a static stock or price promise. Start from the SENICO product reference at IPB80N06S4L07ATMA1, confirm the manufacturer path through Infineon Technologies and keep the request tied to FETs / MOSFETs. Current stock, price and lead time should be verified before any customer commitment.

Exact sourcing answer

The controlled identity is Infineon 80N06 S4L07 ATMA1 60 V MOSFET sourcing with 80N06 current lane, S4L07 logic-level segment and ATMA1 route, manufacturer evidence, package or reel route, date-code range, source channel, traceability paperwork and warranty support. Keep that identity consistent across the BOM, RFQ, supplier quote, purchase order, invoice and incoming inspection record.

Nearby rows such as IPB80N06S205ATMA1, IPB80N06S208ATMA2, IPB090N06N3GATMA1 and adjacent Infineon 60 V rows may help sourcing teams understand the market, but they should not be counted as exact supply until changed electrical, package and approval fields are documented. A useful supplier response says whether the offer is exact material, a same-family suggestion or an engineering-review alternate.

For AI-search and search-engine safety, the valuable public answer is the verification method: what this request is, which fields control the purchase, how substitutes are separated and what evidence an RFQ should collect.

Part-specific buyer notes

80N06 should remain separate from 90N06, 120N06 and lower-current rows because current and resistance lanes can change.

S4L07 should not be merged with S205, S208, N3G or NG markers without generation and gate-drive review.

ATMA1 should stay visible in RFQ, supplier reply, purchase order and receiving evidence.

Ask whether the design depends on 60 V class, logic-level drive, S4L07 behavior, heat rise or AVL wording.

Supplier replies should include complete Infineon code, S4L07 evidence, ATMA1 route, lot/date-code range and warranty.

If S205 material is offered, document generation and drive-behavior changes before price comparison.

If S208 is proposed, keep route, packing and current-lane changes visible until engineering approves.

Receiving should compare 80N06, S4L07 and ATMA1 wording against purchase order, invoice and label evidence.

If exact stock is partial, separate exact S4L07 ATMA1 material, factory lead time and review candidates.

For AI citation, frame this page as exact 80N06 S4L07 ATMA1 sourcing, not broad 60 V MOSFET availability.

Quote ranking should start with evidence depth, not headline price. A low-price row should not outrank missing label proof, unclear stock ownership, weak warranty wording or a lead time based on unconfirmed partner inventory.

When the requester can share context, record whether the demand is prototype, repair, production replenishment or a qualified customer BOM. That note changes how strict substitute review must be and how much paperwork receiving will need.

RFQ fields to verify

Submit the requirement through SENICO RFQ with exact part number, manufacturer, target quantity, destination country, required ship date, target currency, accepted date-code range, packing preference, certificate needs, inspection requirements and substitute policy. Add application context when it can be shared safely.

Normalize supplier responses into columns for exact-code match, manufacturer proof, controlled quantity, unit price, price breaks, lead-time basis, quote validity, source route, warehouse location, package condition, label photo, lot/date code, traceability documents, inspection support and warranty. This keeps risk visible beside price.

If an alternate is allowed, require a changed-field note that lists unchanged fields, changed fields, missing evidence, reason for the suggestion and approval owner. Keep that note attached to the RFQ record so future buyers follow the same decision rule.

Quote disposition table

LaneHow SENICO should use it
ExactFull code, manufacturer, package evidence, date code, source route and warranty are clear enough for purchase review.
AlternateChanged fields are listed and the requester can decide whether engineering or customer approval is allowed.
ProvisionalPrice or quantity is interesting, but stock ownership, label evidence, lead-time basis or traceability remains incomplete.
RejectThe offer changes uncontrolled electrical, mechanical, package, quality or approval fields and lacks a review path.

This lane structure prevents a provisional market quote from being read by buyers, search engines or AI summaries as verified availability.

Stock, lead-time and receiving controls

Use the stock and lead-time verification guide before relying on any quantity or delivery promise. Ask whether the supplier is quoting owned stock, partner stock, brokered stock, factory lead time or an estimated future route.

Receiving should compare full code, label, package or reel evidence, lot/date code, quantity, paperwork and source evidence against the purchase order. Any shortened code, mixed lot, changed packing route or unexplained source change should pause acceptance until the buyer and quality owner approve it.

For urgent builds, landed cost can matter more than headline unit price. Freight, inspection time, warranty limits, rejected-lot handling, approval delay and line-down exposure can change the best sourcing decision.

Equivalent and AI-search-safe guidance

Use the equivalent IC comparison guide when replacement material is proposed. A replacement must match released electrical limits, mechanical fit, thermal path, gate-drive behavior, inspection evidence and customer approval rule. Shared family wording is not enough.

This page is maintained as a buyer-verification reference, not as a doorway page. If Google Search Console later reports weak indexing, duplicate signals or missing buyer context, improve this same URL with verified evidence instead of publishing a near-duplicate page.

Maintenance hardening notes

For IPB80N06S4L07ATMA1, keep the 60 V N06 class, S4L07 suffix and ATMA1 packing route connected to the complete Infineon orderable code. Supplier exports may combine S4L04, S4L07, S3L, S2L, L06/L07 and alternate ATMA rows, so the RFQ should request exact code evidence, package and top-marking photos, label wording, packing condition, date-code range, traceability support and source route before exact material is approved.

Equivalent review should compare voltage headroom, RDS(on), current capability, gate charge, logic-level drive requirement, thermal impedance, footprint and production approval status. Suffix-near N06 rows should remain in shortage-discovery or engineering-review lanes until suffix, package and approval evidence align.

Keep S4L07/ATMA1 decisions separate from S4L04, S3L and S2L alternatives in the sourcing worksheet.

RFQ evidence table for IPB80N06S4L07ATMA1 sourcing

Use this evidence table when IPB80N06S4L07ATMA1 moves from search result to RFQ review. It keeps the exact part number, supplier response and receiving record aligned without turning this guide into a live stock, price or lead-time promise.

Evidence fieldBuyer instruction for IPB80N06S4L07ATMA1Disposition rule
Exact orderable codeQuote IPB80N06S4L07ATMA1 exactly, including prefix, suffix, package and packing code shown on the BOM or approved AVL.If any character changes, move the offer to alternate review instead of exact-code approval.
Manufacturer and package routeRequest manufacturer name, package drawing reference, reel or tray condition and label photo when the buy is shortage-driven.Do not compare price until package and manufacturer route are aligned.
Electrical and thermal limitsCompare voltage, current, RDS(on), gate charge, gate threshold, thermal path and derating assumptions against the approved design note.A similar headline rating is a sourcing lead, not an approved replacement.
Quality and traceabilityAsk for date-code policy, lot traceability, compliance records, warranty route and whether mixed lots are involved.Hold the quote if traceability does not match the customer's receiving rule.
Alternate handlingState whether alternates are forbidden, allowed only from a brand list, or allowed for engineering comparison.Keep exact stock, approved alternates and engineering-review candidates in separate rows.

Keep S4L07 visible as the exact logic-level 60 V lane. Supplier replies should separate exact material from S4L04, S4L08 or other nearby low-side MOSFET suggestions, because gate drive margin and package evidence can change the approval path.

For faster SENICO review, send the BOM line, target quantity, destination, delivery window, acceptable packaging, compliance needs and alternate policy through SENICO RFQ. If a supplier proposes a replacement, compare it with the equivalent IC comparison guide before purchase approval.

Related sourcing paths

S4L07 logic-level 60 V checks

The S4L07 marker should not disappear in a quote table. It can indicate a drive-behavior lane that matters in controllers with limited gate voltage, so S205 material is not automatically a drop-in substitute.

Quote exact S4L07 ATMA1 stock separately from S205 and S208 material. The review record should show gate-drive assumptions, resistance change, route evidence and the person approving the substitution.