Home / Products / FETs, MOSFETs / Alpha & Omega Semiconductor Inc. / AOY516

Alpha & Omega Semiconductor Inc. AOY516

MOSFET N-CH 30V 46A TO251B

Answer first: this page is a purchasing reference for the exact part number AOY516 from Alpha & Omega Semiconductor Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Alpha & Omega Semiconductor Inc. Category: FETs, MOSFETs Part number: AOY516 Package: TO-251-3 Stub Leads, IPAK RFQ verification required

Key Parameters

Part NumberAOY516
ManufacturerAlpha & Omega Semiconductor Inc.
CategoryFETs, MOSFETs
packageTO-251-3 Stub Leads, IPAK
seriesAlphaMOS
packagingTape & Reel (TR)
product statusObsolete
param 1N-Channel
param 2MOSFET (Metal Oxide)
param 330 V
param 446A (Tc)
param 54.5V, 10V
param 65mOhm @ 20A, 10V
param 72.6V @ 250µA
param 833 nC @ 10 V
param 9±20V
param 101333 pF @ 15 V
param 11-
param 122.5W (Ta), 50W (Tc)
param 13-55°C ~ 175°C (TJ)
param 14-
param 15-
param 16Through Hole
param 17TO-251B

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify AOY516 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For AOY516, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.