Home / Products / Circular Connector Assemblies / Amphenol Aerospace Operations / JTP02RE-14-35P-014

Amphenol Aerospace Operations JTP02RE-14-35P-014

CONN RCPT MALE 37POS GOLD CRIMP

Answer first: this page is a purchasing reference for the exact part number JTP02RE-14-35P-014 from Amphenol Aerospace Operations. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Amphenol Aerospace Operations Category: Circular Connector Assemblies Part number: JTP02RE-14-35P-014 Package: RFQ verification required

Key Parameters

Part NumberJTP02RE-14-35P-014
ManufacturerAmphenol Aerospace Operations
CategoryCircular Connector Assemblies
seriesJT
packagingBulk
product statusActive
param 1Receptacle, Male Pins
param 237
param 3-
param 4MIL-DTL-38999 Series II
param 514-35
param 6-
param 7Panel Mount
param 8Flange
param 9Crimp
param 10Bayonet Lock
param 11N (Normal)
param 12Metal
param 13Aluminum Alloy
param 14Olive Drab Cadmium over Nickel
param 15Gold
param 16Olive Drab
param 17Environment Resistant
param 18-
param 19-
param 20Unshielded
param 21-
param 22-
param 23-
param 24-65°C ~ 175°C

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify JTP02RE-14-35P-014 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For JTP02RE-14-35P-014, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.