Banner Engineering Corporation SI-RFPT-H2M
INTERLOCK SWITCH RFID DPST
Answer first: this page is a purchasing reference for the exact part number SI-RFPT-H2M from Banner Engineering Corporation. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | SI-RFPT-H2M |
|---|---|
| Manufacturer | Banner Engineering Corporation |
| Category | Interlock Switches |
| series | SI-RF |
| packaging | Bulk |
| product status | Active |
| param 1 | RFID |
| param 2 | DPST-NC |
| param 3 | 100mA (DC) |
| param 4 | 24VDC |
| param 5 | 24VDC |
| param 6 | - |
| param 7 | Non-Contact |
| param 8 | Cable |
| param 9 | Automatic Reset |
| param 10 | 10mm |
| param 11 | 25mm |
| param 12 | - |
| param 13 | -25°C ~ 70°C |
| param 14 | IP69K - Dust Tight, High Temp Water Jets, Waterproof |
| param 15 | CE, cULus |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify SI-RFPT-H2M Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For SI-RFPT-H2M, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.