Home / Products / Multiple Conductor Cables / Belden Inc. / 1815P 0101000

Belden Inc. 1815P 0101000

4 FS PR #22 FEP SLF SLF

Answer first: this page is a purchasing reference for the exact part number 1815P 0101000 from Belden Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Belden Inc. Category: Multiple Conductor Cables Part number: 1815P 0101000 Package: RFQ verification required

Key Parameters

Part Number1815P 0101000
ManufacturerBelden Inc.
CategoryMultiple Conductor Cables
series-
packagingSpool
product statusActive
param 1Multi-Pair
param 28 (4 Pair)
param 322 AWG
param 47/30
param 5Copper, Tinned
param 6Polyvinylidene Fluoride (PVDF)
param 70.317" (8.05mm)
param 8Foil
param 91000.0' (304.8m)
param 10Black
param 11UL Style CMP
param 12Drain Wire
param 13300 V
param 14-40°C ~ 105°C
param 15Audio
param 160.0150" (0.381mm)
param 17Fluorinated Ethylene-Propylene (FEP)
param 18-
param 19-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify 1815P 0101000 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For 1815P 0101000, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.