Home / Products / Power Entry Modules (PEM) / Bulgin / BZV03/Z0000/15

Bulgin BZV03/Z0000/15

PWR ENT MOD RCPT IEC320-C14 PNL

Answer first: this page is a purchasing reference for the exact part number BZV03/Z0000/15 from Bulgin. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Bulgin Category: Power Entry Modules (PEM) Part number: BZV03/Z0000/15 Package: RFQ verification required

Key Parameters

Part NumberBZV03/Z0000/15
ManufacturerBulgin
CategoryPower Entry Modules (PEM)
seriesPolysnap® BZV
packagingBulk
product statusActive
param 1IEC 320-C14
param 2Receptacle, Male Blades - Module
param 310A
param 4250VAC
param 53
param 6Unfiltered - Commercial
param 7-
param 8Switch On-Off
param 9-
param 10Yes (Fuse Not Included)
param 11Panel Mount, Snap-In
param 12Quick Connect - 0.250" (6.3mm)
param 13Voltage Selector
param 14Fuse Holder, Twin Fused
param 15Rectangular - 34.40mm x 76.50mm
param 160.039" ~ 0.118" (1.00mm ~ 3.00mm)
param 17UL94 V-0
param 18-
param 19CSA, ENEC, UL, VDE

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify BZV03/Z0000/15 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For BZV03/Z0000/15, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.