Home / Products / Panel Indicators, Pilot Lights / c3controls / W22UNR-120LG-WNLG

c3controls W22UNR-120LG-WNLG

22MM UBDY 120V GN NR LED/LENS

Answer first: this page is a purchasing reference for the exact part number W22UNR-120LG-WNLG from c3controls. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: c3controls Category: Panel Indicators, Pilot Lights Part number: W22UNR-120LG-WNLG Package: RFQ verification required

Key Parameters

Part NumberW22UNR-120LG-WNLG
Manufacturerc3controls
CategoryPanel Indicators, Pilot Lights
series22
packagingBag
product statusActive
param 1LED
param 2Green
param 3Green
param 4-
param 5AC/DC
param 6110V ~ 130V
param 73.5mA
param 8Round
param 90.88" (22.23mm)
param 10-
param 11Round with Flat Top
param 122000mcd
param 13-
param 14-
param 15Quick Connect
param 16IP66, IP67
param 17-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify W22UNR-120LG-WNLG Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For W22UNR-120LG-WNLG, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.