Home / Products / Carlo Gavazzi Inc. / RMIA45115/120VAC

Carlo Gavazzi Inc. RMIA45115/120VAC

RELAY GEN PURPOSE 4PDT 5A 120V

Answer first: this page is a purchasing reference for the exact part number RMIA45115/120VAC from Carlo Gavazzi Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Carlo Gavazzi Inc. Part number: RMIA45115/120VAC Package: RFQ verification required

Key Parameters

Part NumberRMIA45115/120VAC
ManufacturerCarlo Gavazzi Inc.
CategoryPower Relays, Over 2 Amps
seriesRMI
packagingBulk
product statusActive
param 1Socketable
param 2115 ~ 120VAC
param 34PDT (4 Form C)
param 410 A
param 5250VAC, 30VDC - Max
param 62500VA, 300W
param 7-
param 8Non Latching
param 9-
param 10Plug In
param 11-
param 12-
param 1396 VAC
param 1436 VAC
param 1520 ms
param 1620 ms
param 17-55°C ~ 70°C
param 18Silver Cerium (AgCe)
param 19CE, CSA, TUV, UR
param 20General Purpose
param 21-
param 22-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify RMIA45115/120VAC Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For RMIA45115/120VAC, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.