Home / Products / FET, MOSFET Arrays / Central Semiconductor Corp / CMKDM8005 TR PBFREE

Central Semiconductor Corp CMKDM8005 TR PBFREE

MOSFET 2P-CH 20V 0.65A SOT363

Answer first: this page is a purchasing reference for the exact part number CMKDM8005 TR PBFREE from Central Semiconductor Corp. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Central Semiconductor Corp Category: FET, MOSFET Arrays Part number: CMKDM8005 TR PBFREE Package: 6-TSSOP, SC-88, SOT-363 RFQ verification required

Key Parameters

Part NumberCMKDM8005 TR PBFREE
ManufacturerCentral Semiconductor Corp
CategoryFET, MOSFET Arrays
package6-TSSOP, SC-88, SOT-363
series-
packagingTape & Reel (TR)
product statusActive
param 1MOSFET (Metal Oxide)
param 22 P-Channel (Dual)
param 3Logic Level Gate
param 420V
param 5650mA
param 6360mOhm @ 350mA, 4.5V
param 71V @ 250µA
param 81.2nC @ 4.5V
param 9100pF @ 16V
param 10350mW
param 11-65°C ~ 150°C (TJ)
param 12-
param 13-
param 14Surface Mount
param 15SOT-363

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify CMKDM8005 TR PBFREE Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For CMKDM8005 TR PBFREE, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.