Home / Products / Bipolar Transistor Arrays / Central Semiconductor Corp / CMLT3946EG TR PBFREE

Central Semiconductor Corp CMLT3946EG TR PBFREE

TRANS NPN/PNP 40V 200MA SOT-563

Answer first: this page is a purchasing reference for the exact part number CMLT3946EG TR PBFREE from Central Semiconductor Corp. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Central Semiconductor Corp Category: Bipolar Transistor Arrays Part number: CMLT3946EG TR PBFREE Package: SOT-563, SOT-666 RFQ verification required

Key Parameters

Part NumberCMLT3946EG TR PBFREE
ManufacturerCentral Semiconductor Corp
CategoryBipolar Transistor Arrays
packageSOT-563, SOT-666
series-
packagingTape & Reel (TR)
product statusActive
param 11 NPN, 1 PNP
param 2200mA
param 340V
param 4100mV @ 5mA, 50mA / 200mV @ 5mA, 50mA
param 5-
param 630 @ 100mA, 1V / 150 @ 10mA, 1V
param 7150mW
param 8300MHz
param 9-65°C ~ 150°C (TJ)
param 10-
param 11-
param 12Surface Mount
param 13SOT-563

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify CMLT3946EG TR PBFREE Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For CMLT3946EG TR PBFREE, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.