Home / Products / Zener Diode Arrays / Central Semiconductor Corp / CMSZDA12V TR PBFREE

Central Semiconductor Corp CMSZDA12V TR PBFREE

DIODE ZENER 12V 275MW SOT323

Answer first: this page is a purchasing reference for the exact part number CMSZDA12V TR PBFREE from Central Semiconductor Corp. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Central Semiconductor Corp Category: Zener Diode Arrays Part number: CMSZDA12V TR PBFREE Package: SC-70, SOT-323 RFQ verification required

Key Parameters

Part NumberCMSZDA12V TR PBFREE
ManufacturerCentral Semiconductor Corp
CategoryZener Diode Arrays
packageSC-70, SOT-323
series-
packagingTape & Reel (TR)
product statusActive
param 11 Pair Common Anode
param 212 V
param 3±5%
param 4275 mW
param 525 Ohms
param 6100 nA @ 8 V
param 7900 mV @ 10 mA
param 8-65°C ~ 150°C
param 9-
param 10-
param 11Surface Mount
param 12SOT-323

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify CMSZDA12V TR PBFREE Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For CMSZDA12V TR PBFREE, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.