Home / Products / Bipolar Transistor Arrays / Central Semiconductor Corp / MPQ3798 PBFREE

Central Semiconductor Corp MPQ3798 PBFREE

TRANS 4PNP QUAD 40V 50MA TO-116

Answer first: this page is a purchasing reference for the exact part number MPQ3798 PBFREE from Central Semiconductor Corp. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Central Semiconductor Corp Category: Bipolar Transistor Arrays Part number: MPQ3798 PBFREE Package: 14-DIP (0.300", 7.62mm) RFQ verification required

Key Parameters

Part NumberMPQ3798 PBFREE
ManufacturerCentral Semiconductor Corp
CategoryBipolar Transistor Arrays
package14-DIP (0.300", 7.62mm)
series-
packagingTube
product statusObsolete
param 14 PNP (Quad)
param 250mA
param 340V
param 4250mV @ 100µA, 1mA
param 510nA (ICBO)
param 6125 @ 10mA, 5V
param 7500mW
param 860MHz
param 9-65°C ~ 150°C (TJ)
param 10-
param 11-
param 12Through Hole
param 13TO-116

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify MPQ3798 PBFREE Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For MPQ3798 PBFREE, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.