Home / Products / LED COBs, Engines, Modules, Strips / Citizen / CLU701-0304C4-403M2K1

Citizen CLU701-0304C4-403M2K1

LED COB CLU701 NEUT WH SQ 4000K

Answer first: this page is a purchasing reference for the exact part number CLU701-0304C4-403M2K1 from Citizen. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Citizen Category: LED COBs, Engines, Modules, Strips Part number: CLU701-0304C4-403M2K1 Package: RFQ verification required

Key Parameters

Part NumberCLU701-0304C4-403M2K1
ManufacturerCitizen
CategoryLED COBs, Engines, Modules, Strips
seriesCLU701
packagingTray
product statusActive
param 1Chip On Board (COB)
param 2White, Neutral
param 34000K
param 4-
param 5Square
param 6834lm (Typ)
param 7700mA
param 885°C
param 99.4V
param 10127 lm/W
param 11920mA
param 1280
param 13-
param 14-
param 1513.50mm L x 13.50mm W
param 16-
param 176.00mm Dia
param 18Flat

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify CLU701-0304C4-403M2K1 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For CLU701-0304C4-403M2K1, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.