Home / Products / Aluminum Electrolytic Capacitors / Cornell Dubilier Knowles / 3186GL123S400JPA1

Cornell Dubilier Knowles 3186GL123S400JPA1

CAP ALUM 12000UF 400V SCREW

Answer first: this page is a purchasing reference for the exact part number 3186GL123S400JPA1 from Cornell Dubilier Knowles. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Cornell Dubilier Knowles Category: Aluminum Electrolytic Capacitors Part number: 3186GL123S400JPA1 Package: RFQ verification required

Key Parameters

Part Number3186GL123S400JPA1
ManufacturerCornell Dubilier Knowles
CategoryAluminum Electrolytic Capacitors
series3186
packagingBag
product statusActive
param 1-
param 2-
param 3-
param 4-
param 5-
param 6-
param 7-
param 8-
param 9General Purpose
param 10-
param 11-
param 12-
param 13-
param 14-
param 15-
param 16-
param 17-
param 18-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify 3186GL123S400JPA1 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For 3186GL123S400JPA1, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.