Home / Products / Aluminum Electrolytic Capacitors / Cornell Dubilier Knowles / ATB476M050F065

Cornell Dubilier Knowles ATB476M050F065

CAP ALUM 47UF 20% 50V SMD

Answer first: this page is a purchasing reference for the exact part number ATB476M050F065 from Cornell Dubilier Knowles. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Cornell Dubilier Knowles Category: Aluminum Electrolytic Capacitors Part number: ATB476M050F065 Package: RFQ verification required

Key Parameters

Part NumberATB476M050F065
ManufacturerCornell Dubilier Knowles
CategoryAluminum Electrolytic Capacitors
seriesATB
packagingTape & Reel (TR)
product statusActive
param 147 µF
param 2±20%
param 350 V
param 44.233Ohm @ 120Hz
param 53000 Hrs @ 105°C
param 6-55°C ~ 105°C
param 7Polar
param 8-
param 9Bypass, Decoupling
param 10245 mA @ 120 Hz
param 11350 mA @ 100 kHz
param 12340 mOhms
param 13-
param 140.315" Dia (8.00mm)
param 150.268" (6.80mm)
param 160.354" L x 0.335" W (9.00mm x 8.50mm)
param 17Surface Mount
param 18Radial, Can - SMD

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify ATB476M050F065 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For ATB476M050F065, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.