Home / Products / Film Capacitors / Cornell Dubilier Knowles / FCP0805C103J-J2

Cornell Dubilier Knowles FCP0805C103J-J2

CAP FILM 10000PF 5% 16VDC 0805

Answer first: this page is a purchasing reference for the exact part number FCP0805C103J-J2 from Cornell Dubilier Knowles. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Cornell Dubilier Knowles Category: Film Capacitors Part number: FCP0805C103J-J2 Package: 0805 (2012 Metric) RFQ verification required

Key Parameters

Part NumberFCP0805C103J-J2
ManufacturerCornell Dubilier Knowles
CategoryFilm Capacitors
package0805 (2012 Metric)
seriesFCP
packagingTape & Reel (TR)
product statusActive
param 110000 pF
param 2±5%
param 3-
param 416V
param 5Polyphenylene Sulfide (PPS)
param 6-
param 7-55°C ~ 125°C
param 8Surface Mount
param 90.079" L x 0.049" W (2.00mm x 1.25mm)
param 100.051" (1.30mm)
param 11Solder Pads
param 12-
param 13High Frequency, Switching
param 14-
param 15-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify FCP0805C103J-J2 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For FCP0805C103J-J2, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.