Home / Products / Uninterruptible Power Supply (UPS) Systems / Cyber Power Systems (USA) Inc. / CP550SLG

Cyber Power Systems (USA) Inc. CP550SLG

550VA/330W, Simulated Sine Wave,

Answer first: this page is a purchasing reference for the exact part number CP550SLG from Cyber Power Systems (USA) Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Cyber Power Systems (USA) Inc. Category: Uninterruptible Power Supply (UPS) Systems Part number: CP550SLG Package: RFQ verification required

Key Parameters

Part NumberCP550SLG
ManufacturerCyber Power Systems (USA) Inc.
CategoryUninterruptible Power Supply (UPS) Systems
series-
packagingTape & Box (TB)
product statusActive
param 1Standby (No Regulation)
param 296V ~ 140V
param 3Desktop, Home Theater
param 4Tower
param 5550VA / 330W
param 68 (4 UPS, 4 Surge Only)
param 72 minutes
param 8-
param 9120V
param 10NEMA 5-15P
param 11NEMA 5-15R
param 125' (1.52m)
param 13-
param 143.300" L x 9.800" W (83.82mm x 248.92mm)
param 155.800" (147.32mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify CP550SLG Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For CP550SLG, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.