Home / Products / Uninterruptible Power Supply (UPS) Systems / Cyber Power Systems (USA) Inc. / OL3000RTXL2UHVN

Cyber Power Systems (USA) Inc. OL3000RTXL2UHVN

3000VA/2700W, 0.9PF, Pure Sine W

Answer first: this page is a purchasing reference for the exact part number OL3000RTXL2UHVN from Cyber Power Systems (USA) Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Cyber Power Systems (USA) Inc. Category: Uninterruptible Power Supply (UPS) Systems Part number: OL3000RTXL2UHVN Package: RFQ verification required

Key Parameters

Part NumberOL3000RTXL2UHVN
ManufacturerCyber Power Systems (USA) Inc.
CategoryUninterruptible Power Supply (UPS) Systems
series-
packagingTape & Box (TB)
product statusActive
param 1Online (Double Conversion)
param 2120V ~ 280V
param 3General Purpose, Industrial Control
param 4Rackmount, Tower
param 53kVA / 2700W
param 63 (UPS)
param 73.5 minutes
param 8RJ11, RJ45
param 9200VAC, 208VAC, 220VAC, 230VAC, 240VAC
param 10NEMA L6-20P
param 11NEMA L6-20R (2), NEMA L6-30R (1)
param 1210' (3.05m)
param 13-
param 1423.620" L x 17.000" W (599.95mm x 431.80mm)
param 153.500" (88.90mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify OL3000RTXL2UHVN Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For OL3000RTXL2UHVN, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.