Home / Products / Surge Protection Devices (SPDs) / Eaton - Bussmann Electrical Division / BSPM2240S3G

Eaton - Bussmann Electrical Division BSPM2240S3G

SPD TYPE 2 550VAC MCOV 2 POLE

Answer first: this page is a purchasing reference for the exact part number BSPM2240S3G from Eaton - Bussmann Electrical Division. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Eaton - Bussmann Electrical Division Category: Surge Protection Devices (SPDs) Part number: BSPM2240S3G Package: RFQ verification required

Key Parameters

Part NumberBSPM2240S3G
ManufacturerEaton - Bussmann Electrical Division
CategorySurge Protection Devices (SPDs)
seriesBSPM
packagingBulk
product statusObsolete
param 1Type 2
param 2Base + Module
param 32
param 4550VAC
param 520 kA
param 640 kA
param 7200 kA
param 81.8 kV
param 9-
param 10-
param 11Remote Signaling Contacts, Thermally Protected
param 12DIN Rail
param 13CE, cURus, UL

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify BSPM2240S3G Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For BSPM2240S3G, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.