Home / Products / AC Fans / ebm-papst Inc. / D2E097-BI56-02

ebm-papst Inc. D2E097-BI56-02

FAN BLWR CENT 162X180MM 230VAC

Answer first: this page is a purchasing reference for the exact part number D2E097-BI56-02 from ebm-papst Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: ebm-papst Inc. Category: AC Fans Part number: D2E097-BI56-02 Package: RFQ verification required

Key Parameters

Part NumberD2E097-BI56-02
Manufacturerebm-papst Inc.
CategoryAC Fans
seriesD2E097
packagingBulk
product statusActive
param 1230VAC
param 2Rectangular/Rounded - 162mm L x 165mm H
param 3180.0mm
param 4241.3 CFM (6.76m³/min)
param 5-
param 6Ball
param 7Blower, Centrifugal
param 8Capacitor, Thermal Overload Protection (TOP)
param 957.0dB(A)
param 10100W
param 111850 RPM
param 122 Wire Leads
param 13IP20
param 1435°C
param 15CCC, CE, GOST
param 163.3 lbs (1.5 kg)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify D2E097-BI56-02 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For D2E097-BI56-02, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.