Home / Products / AC Fans / ebm-papst Inc. / K1G200-AA95-02

ebm-papst Inc. K1G200-AA95-02

MOTORIZED IMPELLER

Answer first: this page is a purchasing reference for the exact part number K1G200-AA95-02 from ebm-papst Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: ebm-papst Inc. Category: AC Fans Part number: K1G200-AA95-02 Package: RFQ verification required

Key Parameters

Part NumberK1G200-AA95-02
Manufacturerebm-papst Inc.
CategoryAC Fans
seriesK1G200
packagingBulk
product statusActive
param 1115VAC
param 2Round - 250mm Dia
param 378.50mm
param 4-
param 50.482 in H2O (120.0 Pa)
param 6Ball
param 7Tubeaxial
param 8Dual Speed, Electronic Commutation (EC), Thermal Overload Protector (TOP)
param 9-
param 1031.00W
param 111500/2000 RPM
param 123 Wire Leads with Splice Terminals
param 13IP55 - Dust Protected, Water Resistant
param 14-22 ~ 122°F (-30 ~ 50°C)
param 15CSA, EAC, UL, VDE
param 16-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify K1G200-AA95-02 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For K1G200-AA95-02, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.