Home / Products / Motors - AC, DC / ebm-papst Inc. / VG.VD4915BK1.P63.1.5

ebm-papst Inc. VG.VD4915BK1.P63.1.5

GEARMOTOR 900 RPM 24V PLANETARY

Answer first: this page is a purchasing reference for the exact part number VG.VD4915BK1.P63.1.5 from ebm-papst Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: ebm-papst Inc. Category: Motors - AC, DC Part number: VG.VD4915BK1.P63.1.5 Package: RFQ verification required

Key Parameters

Part NumberVG.VD4915BK1.P63.1.5
Manufacturerebm-papst Inc.
CategoryMotors - AC, DC
seriesVD
packagingBulk
product statusActive
param 1DC Motor
param 2Gearmotor
param 3Brushless (BLDC)
param 424VDC
param 5900 RPM
param 6166.4 / 1175
param 7-
param 8-
param 9Round - 1.929" Dia (49.00mm)
param 100.591" (15.00mm)
param 111.535" (39.00mm)
param 122.047" (52.00mm)
param 13Wire Leads with Connector
param 14-
param 155
param 16-
param 170°C ~ 40°C

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify VG.VD4915BK1.P63.1.5 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For VG.VD4915BK1.P63.1.5, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.