Home / Products / Gateways, Routers / Elastel / EG410-CM4102008-N

Elastel EG410-CM4102008-N

IND RASPBERRY PI GATEWAY WIFI

Answer first: this page is a purchasing reference for the exact part number EG410-CM4102008-N from Elastel. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Elastel Category: Gateways, Routers Part number: EG410-CM4102008-N Package: RFQ verification required

Key Parameters

Part NumberEG410-CM4102008-N
ManufacturerElastel
CategoryGateways, Routers
seriesEG
packagingBulk
product statusActive
param 1Gateway
param 2ARP, BGP, DDNS, DHCP, DNS, HTTP, Load Balance, Modbus RTU/TCP, MQTT, OSPF, PPP, PPPoE, QoS, RIPv1/v2, SNTP, SNMP v1/v2c/v3, SSH, TCP, Telnet, UDP, WWAN and WAN Failover
param 32.4GHz, 5GHz
param 4General Purpose
param 5Dual Band 2.4GHz/5GHz Wi-Fi + Bluetooth 5.0, Gigabit Ethernet, HDMI 2.0, RS-232, RS-485, RJ-45, USB 2.0 x 2
param 6-
param 7-
param 8-
param 92GB RAM + 8GB eMMC, Broadcom BCM2711, IoT Gateway, Quad-core A72 (ARM v8)@ 1.5 GHz, Raspberry Pi

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify EG410-CM4102008-N Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For EG410-CM4102008-N, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.