Home / Products / Aluminum - Polymer Capacitors / Elna America / RAHTX331M1TFH0002ZT

Elna America RAHTX331M1TFH0002ZT

CAP ALUMHYB 330UF 20% 25V SMD

Answer first: this page is a purchasing reference for the exact part number RAHTX331M1TFH0002ZT from Elna America. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Elna America Category: Aluminum - Polymer Capacitors Part number: RAHTX331M1TFH0002ZT Package: RFQ verification required

Key Parameters

Part NumberRAHTX331M1TFH0002ZT
ManufacturerElna America
CategoryAluminum - Polymer Capacitors
seriesHTX
packagingTape & Reel (TR)
product statusActive
param 1Hybrid
param 2330 µF
param 3±20%
param 425 V
param 520mOhm
param 64000 Hrs @ 135°C
param 7-55°C ~ 135°C
param 8AEC-Q200
param 9Automotive
param 10Anti-Vibration
param 11200 mA @ 120 Hz
param 122 A @ 100 kHz
param 13-
param 14-
param 150.394" Dia (10.00mm)
param 160.413" (10.50mm)
param 170.409" L x 0.409" W (10.40mm x 10.40mm)
param 18Surface Mount
param 19Radial, Can - SMD

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify RAHTX331M1TFH0002ZT Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For RAHTX331M1TFH0002ZT, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.