Home / Products / Aluminum - Polymer Capacitors / Elna America / RSHVK391M1GFK5002E

Elna America RSHVK391M1GFK5002E

CAP ALUMHYB 390UF 20% 35V SMD

Answer first: this page is a purchasing reference for the exact part number RSHVK391M1GFK5002E from Elna America. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Elna America Category: Aluminum - Polymer Capacitors Part number: RSHVK391M1GFK5002E Package: RFQ verification required

Key Parameters

Part NumberRSHVK391M1GFK5002E
ManufacturerElna America
CategoryAluminum - Polymer Capacitors
seriesHVK
packagingTape & Reel (TR)
product statusActive
param 1Hybrid
param 2390 µF
param 3±20%
param 435 V
param 518mOhm
param 66000 Hrs @ 125°C
param 7-55°C ~ 125°C
param 8-
param 9General Purpose
param 10-
param 11300 mA @ 120 Hz
param 123 A @ 100 kHz
param 13-
param 14-
param 150.394" Dia (10.00mm)
param 160.512" (13.00mm)
param 170.409" L x 0.409" W (10.40mm x 10.40mm)
param 18Surface Mount
param 19Radial, Can - SMD

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify RSHVK391M1GFK5002E Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For RSHVK391M1GFK5002E, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.