Home / Products / FET, MOSFET Arrays / Fairchild Semiconductor / FDMJ1023PZ

Fairchild Semiconductor FDMJ1023PZ

MOSFET 2P-CH 20V 2.9A SC75

Answer first: this page is a purchasing reference for the exact part number FDMJ1023PZ from Fairchild Semiconductor. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Fairchild Semiconductor Category: FET, MOSFET Arrays Part number: FDMJ1023PZ Package: 6-WFDFN Exposed Pad RFQ verification required

Key Parameters

Part NumberFDMJ1023PZ
ManufacturerFairchild Semiconductor
CategoryFET, MOSFET Arrays
package6-WFDFN Exposed Pad
seriesPowerTrench®
packagingBulk
product statusObsolete
param 1MOSFET (Metal Oxide)
param 22 P-Channel (Dual)
param 3Logic Level Gate
param 420V
param 52.9A
param 6112mOhm @ 2.9A, 4.5V
param 71V @ 250µA
param 86.5nC @ 4.5V
param 9400pF @ 10V
param 10700mW
param 11-55°C ~ 150°C (TJ)
param 12-
param 13-
param 14Surface Mount
param 15SC-75, MicroFET

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify FDMJ1023PZ Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For FDMJ1023PZ, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.