Home / Products / RF Transceiver Modules and Modems / Fanstel Corp. / BT680T

Fanstel Corp. BT680T

RF TXRX MOD BT PCB TH SMD

Answer first: this page is a purchasing reference for the exact part number BT680T from Fanstel Corp.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Fanstel Corp. Category: RF Transceiver Modules and Modems Part number: BT680T Package: 40-SMD Module RFQ verification required

Key Parameters

Part NumberBT680T
ManufacturerFanstel Corp.
CategoryRF Transceiver Modules and Modems
package40-SMD Module
series-
packagingCut Tape (CT)
product statusActive
param 1Not Verified
param 2Bluetooth
param 3Bluetooth v5.0
param 4-
param 5-
param 62Mbps
param 78dBm
param 8-105dBm
param 9ADC, GPIO, I2C, PWM, SPI, UART
param 10PCB Trace
param 11TC35681FSG-002
param 12144kB RAM
param 131.9V ~ 3.6V
param 145.1mA ~ 5.5mA
param 156mA ~ 11.5mA
param 16Surface Mount
param 17-40°C ~ 85°C

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify BT680T Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For BT680T, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.