Home / Products / Harvatek Corporation / B0221URO-02D000154U1930

Harvatek Corporation B0221URO-02D000154U1930

LED RED DIFFUSED 2SMD

Answer first: this page is a purchasing reference for the exact part number B0221URO-02D000154U1930 from Harvatek Corporation. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Harvatek Corporation Part number: B0221URO-02D000154U1930 Package: 2-SMD, No Lead RFQ verification required

Key Parameters

Part NumberB0221URO-02D000154U1930
ManufacturerHarvatek Corporation
CategoryLED Indication - Discrete
package2-SMD, No Lead
series-
packagingCut Tape (CT)
product statusActive
param 1Red
param 2-
param 3-
param 4Diffused
param 511.25mcd
param 6Rectangle with Flat Top
param 70.65mm x 0.38mm
param 82V
param 92mA
param 10110°
param 11Surface Mount
param 12631nm
param 13639nm
param 14-
param 15-
param 16-
param 172-SMD
param 180.65mm L x 0.38mm W
param 190.46mm

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify B0221URO-02D000154U1930 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For B0221URO-02D000154U1930, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.