Home / Products / Honeywell Sensing and Productivity Solutions / AML24GBE2CA05

Honeywell Sensing and Productivity Solutions AML24GBE2CA05

SWITCH ROCKER DPDT 3A 125V

Answer first: this page is a purchasing reference for the exact part number AML24GBE2CA05 from Honeywell Sensing and Productivity Solutions. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Honeywell Sensing and Productivity Solutions Part number: AML24GBE2CA05 Package: RFQ verification required

Key Parameters

Part NumberAML24GBE2CA05
ManufacturerHoneywell Sensing and Productivity Solutions
CategoryRocker Switches
seriesAML24
packagingBulk
product statusActive
param 1Panel Mount, Snap-In
param 2DPDT
param 3Mom-On-Mom
param 43A (AC), 2A (DC)
param 5125 V
param 624 V
param 7Actuator Arm, Cap Required - Illuminated
param 8-
param 9Varies by Cap
param 10Incandescent
param 1128 VAC
param 12Solder, Quick Connect - 0.110" (2.8mm)
param 13-
param 14-
param 15Rectangular - 28.98mm x 19.05mm
param 16-
param 17CSA, CE, UL, VDE

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify AML24GBE2CA05 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For AML24GBE2CA05, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.