Home / Products / Single FETs, MOSFETs / Infineon Technologies / BF2040E6814HTSA1

Infineon Technologies BF2040E6814HTSA1

RF MOSFET 5V SOT143

Answer first: this page is a purchasing reference for the exact part number BF2040E6814HTSA1 from Infineon Technologies. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Infineon Technologies Category: Single FETs, MOSFETs Part number: BF2040E6814HTSA1 Package: TO-253-4, TO-253AA RFQ verification required

Key Parameters

Part NumberBF2040E6814HTSA1
ManufacturerInfineon Technologies
CategorySingle FETs, MOSFETs
packageTO-253-4, TO-253AA
series-
packagingTape & Reel (TR)
product statusObsolete
param 1MOSFET (Metal Oxide)
param 2N-Channel
param 3800MHz
param 423dB
param 55 V
param 640mA
param 71.6dB
param 815 mA
param 9-
param 108 V
param 11-
param 12-
param 13Surface Mount
param 14PG-SOT-143-3D

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify BF2040E6814HTSA1 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For BF2040E6814HTSA1, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.