Home / Products / AC DC Converters, Offline Switches / Infineon Technologies / ICE3B2065P-2

Infineon Technologies ICE3B2065P-2

IC OFFLINE SWITCH

Answer first: this page is a purchasing reference for the exact part number ICE3B2065P-2 from Infineon Technologies. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Infineon Technologies Category: AC DC Converters, Offline Switches Part number: ICE3B2065P-2 Package: TO-220-6 Formed Leads RFQ verification required

Key Parameters

Part NumberICE3B2065P-2
ManufacturerInfineon Technologies
CategoryAC DC Converters, Offline Switches
packageTO-220-6 Formed Leads
series-
packagingBulk
product statusActive
param 1Isolated
param 2Yes
param 3650V
param 4Flyback
param 515 V
param 68.5V ~ 21V
param 772%
param 867kHz
param 9102 W
param 10Current Limiting, Open Loop, Over Load, Over Temperature, Over Voltage
param 11Soft Start
param 12-25°C ~ 130°C (TJ)
param 13-
param 14-
param 15PG-TO220-6-47
param 16Through Hole

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify ICE3B2065P-2 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For ICE3B2065P-2, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.