Home / Products / Infineon Technologies / IPD50R399CPBTMA1

Infineon Technologies IPD50R399CPBTMA1

LOW POWER_LEGACY

Answer first: this page is a purchasing reference for the exact part number IPD50R399CPBTMA1 from Infineon Technologies. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Infineon Technologies Part number: IPD50R399CPBTMA1 Package: TO-252-3, DPAK (2 Leads + Tab), SC-63 RFQ verification required

Key Parameters

Part NumberIPD50R399CPBTMA1
ManufacturerInfineon Technologies
CategoryFETs, MOSFETs
packageTO-252-3, DPAK (2 Leads + Tab), SC-63
seriesCoolMOS™ CP
packagingTape & Reel (TR)
product statusObsolete
param 1N-Channel
param 2MOSFET (Metal Oxide)
param 3500 V
param 49A (Tc)
param 510V
param 6399mOhm @ 4.9A, 10V
param 73.5V @ 330µA
param 823 nC @ 10 V
param 9±20V
param 10890 pF @ 100 V
param 11-
param 1283W (Tc)
param 13-55°C ~ 150°C (TJ)
param 14-
param 15-
param 16Surface Mount
param 17PG-TO252-3-313

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify IPD50R399CPBTMA1 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For IPD50R399CPBTMA1, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.