Home / Products / FETs, MOSFETs / Infineon Technologies / IPP90N06S4L04AKSA2

Infineon Technologies IPP90N06S4L04AKSA2

MOSFET N-CH 60V 90A TO220-3

Answer first: this page is a purchasing reference for the exact part number IPP90N06S4L04AKSA2 from Infineon Technologies. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Infineon Technologies Category: FETs, MOSFETs Part number: IPP90N06S4L04AKSA2 Package: TO-220-3 RFQ verification required

Key Parameters

Part NumberIPP90N06S4L04AKSA2
ManufacturerInfineon Technologies
CategoryFETs, MOSFETs
packageTO-220-3
seriesOptiMOS™
packagingTape & Reel (TR)
product statusObsolete
param 1N-Channel
param 2MOSFET (Metal Oxide)
param 360 V
param 490A (Tc)
param 54.5V, 10V
param 63.7mOhm @ 90A, 10V
param 72.2V @ 90µA
param 8170 nC @ 10 V
param 9±16V
param 1013000 pF @ 25 V
param 11-
param 12150W (Tc)
param 13-55°C ~ 175°C (TJ)
param 14Automotive
param 15AEC-Q101
param 16Through Hole
param 17PG-TO220-3-1

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify IPP90N06S4L04AKSA2 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For IPP90N06S4L04AKSA2, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.