Home / Products / FETs, MOSFETs / Infineon Technologies / IPW60R099CPAFKSA1

Infineon Technologies IPW60R099CPAFKSA1

MOSFET N-CH 600V 31A TO247-3

Answer first: this page is a purchasing reference for the exact part number IPW60R099CPAFKSA1 from Infineon Technologies. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Infineon Technologies Category: FETs, MOSFETs Part number: IPW60R099CPAFKSA1 Package: TO-247-3 RFQ verification required

Key Parameters

Part NumberIPW60R099CPAFKSA1
ManufacturerInfineon Technologies
CategoryFETs, MOSFETs
packageTO-247-3
seriesCoolMOS™
packagingTube
product statusActive
param 1N-Channel
param 2MOSFET (Metal Oxide)
param 3600 V
param 431A (Tc)
param 510V
param 6105mOhm @ 18A, 10V
param 73.5V @ 1.2mA
param 880 nC @ 10 V
param 9±20V
param 102800 pF @ 100 V
param 11-
param 12255W (Tc)
param 13-40°C ~ 150°C (TJ)
param 14Automotive
param 15AEC-Q101
param 16Through Hole
param 17PG-TO247-3

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify IPW60R099CPAFKSA1 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For IPW60R099CPAFKSA1, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.