Home / Products / FETs, MOSFETs / Infineon Technologies / IQE013N04LM6SCATMA1

Infineon Technologies IQE013N04LM6SCATMA1

OPTIMOS LOWVOLTAGE POWER MOSFET

Answer first: this page is a purchasing reference for the exact part number IQE013N04LM6SCATMA1 from Infineon Technologies. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Infineon Technologies Category: FETs, MOSFETs Part number: IQE013N04LM6SCATMA1 Package: 8-PowerWDFN RFQ verification required

Key Parameters

Part NumberIQE013N04LM6SCATMA1
ManufacturerInfineon Technologies
CategoryFETs, MOSFETs
package8-PowerWDFN
seriesOptiMOS™ 6
packagingTape & Reel (TR)
product statusActive
param 1N-Channel
param 2MOSFET (Metal Oxide)
param 340 V
param 431A (Ta), 205A (Tc)
param 54.5V, 10V
param 61.35mOhm @ 20A, 10V
param 72V @ 51µA
param 841 nC @ 10 V
param 9±20V
param 103800 pF @ 20 V
param 11-
param 122.5W (Ta), 107W (Tc)
param 13-55°C ~ 175°C (TJ)
param 14-
param 15-
param 16Surface Mount
param 17PG-WHSON-8-1

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify IQE013N04LM6SCATMA1 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For IQE013N04LM6SCATMA1, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.