Home / Products / Infineon Technologies / SPS03N60C3

Infineon Technologies SPS03N60C3

MOSFET N-CH 600V 3.2A TO251-3

Answer first: this page is a purchasing reference for the exact part number SPS03N60C3 from Infineon Technologies. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Infineon Technologies Part number: SPS03N60C3 Package: TO-251-3 Stub Leads, IPAK RFQ verification required

Key Parameters

Part NumberSPS03N60C3
ManufacturerInfineon Technologies
CategoryFETs, MOSFETs
packageTO-251-3 Stub Leads, IPAK
seriesCoolMOS™
packagingBulk
product statusObsolete
param 1N-Channel
param 2MOSFET (Metal Oxide)
param 3600 V
param 43.2A (Tc)
param 510V
param 61.4Ohm @ 2A, 10V
param 73.9V @ 135µA
param 817 nC @ 10 V
param 9±20V
param 10400 pF @ 25 V
param 11-
param 1238W (Tc)
param 13-55°C ~ 150°C (TJ)
param 14-
param 15-
param 16Through Hole
param 17PG-TO251-3-11

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify SPS03N60C3 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For SPS03N60C3, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.