KEMET SCF25XV-280-2R1A005JV
CMC 600UH 28A 2LN TH AEC-Q200
Answer first: this page is a purchasing reference for the exact part number SCF25XV-280-2R1A005JV from KEMET. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | SCF25XV-280-2R1A005JV |
|---|---|
| Manufacturer | KEMET |
| Category | Common Mode Chokes |
| package | Vertical, 4 PC Pin |
| series | SCF-XV |
| packaging | Tray |
| product status | Active |
| param 1 | Power Line |
| param 2 | 2 |
| param 3 | - |
| param 4 | 600 µH @ 100 kHz |
| param 5 | 28A |
| param 6 | 1.39mOhm |
| param 7 | 1000V (1kV) |
| param 8 | 1000V (1kV) |
| param 9 | -40°C ~ 150°C |
| param 10 | AEC-Q200 |
| param 11 | - |
| param 12 | - |
| param 13 | - |
| param 14 | - |
| param 15 | Through Hole |
| param 16 | 1.516" L x 1.043" W (38.50mm x 26.50mm) |
| param 17 | 1.378" (35.00mm) |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify SCF25XV-280-2R1A005JV Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For SCF25XV-280-2R1A005JV, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.