KEMET SCF47B-300-S2R0B012J
CMC 1.2MH 30A 3LN TH
Answer first: this page is a purchasing reference for the exact part number SCF47B-300-S2R0B012J from KEMET. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | SCF47B-300-S2R0B012J |
|---|---|
| Manufacturer | KEMET |
| Category | Common Mode Chokes |
| package | Vertical, 6 PC Pin |
| series | SCF Three Phase |
| packaging | Tray |
| product status | Active |
| param 1 | Power Line |
| param 2 | 3 |
| param 3 | - |
| param 4 | 1.2 mH @ 100 kHz |
| param 5 | 30A |
| param 6 | 2.4mOhm |
| param 7 | 250V |
| param 8 | 250V |
| param 9 | -25°C ~ 120°C |
| param 10 | - |
| param 11 | - |
| param 12 | - |
| param 13 | - |
| param 14 | - |
| param 15 | Through Hole |
| param 16 | 2.480" Dia (63.00mm) |
| param 17 | 2.559" (65.00mm) |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify SCF47B-300-S2R0B012J Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For SCF47B-300-S2R0B012J, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.