Home / Products / Common Mode Chokes / KEMET / SCF47B-300-S2R0B012J

KEMET SCF47B-300-S2R0B012J

CMC 1.2MH 30A 3LN TH

Answer first: this page is a purchasing reference for the exact part number SCF47B-300-S2R0B012J from KEMET. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: KEMET Category: Common Mode Chokes Part number: SCF47B-300-S2R0B012J Package: Vertical, 6 PC Pin RFQ verification required

Key Parameters

Part NumberSCF47B-300-S2R0B012J
ManufacturerKEMET
CategoryCommon Mode Chokes
packageVertical, 6 PC Pin
seriesSCF Three Phase
packagingTray
product statusActive
param 1Power Line
param 23
param 3-
param 41.2 mH @ 100 kHz
param 530A
param 62.4mOhm
param 7250V
param 8250V
param 9-25°C ~ 120°C
param 10-
param 11-
param 12-
param 13-
param 14-
param 15Through Hole
param 162.480" Dia (63.00mm)
param 172.559" (65.00mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify SCF47B-300-S2R0B012J Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For SCF47B-300-S2R0B012J, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.