Home / Products / LED Indication - Discrete / Kingbright / APBD3224SURKCGKC-F01

Kingbright APBD3224SURKCGKC-F01

LED GREEN/RED CLEAR CHIP SMD

Answer first: this page is a purchasing reference for the exact part number APBD3224SURKCGKC-F01 from Kingbright. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Kingbright Category: LED Indication - Discrete Part number: APBD3224SURKCGKC-F01 Package: 4-SMD, No Lead RFQ verification required

Key Parameters

Part NumberAPBD3224SURKCGKC-F01
ManufacturerKingbright
CategoryLED Indication - Discrete
package4-SMD, No Lead
series-
packagingTape & Reel (TR)
product statusActive
param 1Green, Red
param 2Independent
param 3Colorless
param 4Clear
param 5280mcd Green, 400mcd Red
param 6Round with Domed Top
param 71.80mm Dia
param 82.1V Green, 1.95V Red
param 920mA Green, 20mA Red
param 1020°
param 11Surface Mount
param 12570nm Green, 630nm Red
param 13574nm Green, 645nm Red
param 14-
param 15-
param 16-
param 17Chip LED
param 183.20mm L x 2.40mm W
param 192.40mm

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify APBD3224SURKCGKC-F01 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For APBD3224SURKCGKC-F01, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.