Home / Products / Gateways, Routers / Lantronix, Inc. / M113F00FS

Lantronix, Inc. M113F00FS

MODEM M113M1/NB1

Answer first: this page is a purchasing reference for the exact part number M113F00FS from Lantronix, Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Lantronix, Inc. Category: Gateways, Routers Part number: M113F00FS Package: RFQ verification required

Key Parameters

Part NumberM113F00FS
ManufacturerLantronix, Inc.
CategoryGateways, Routers
seriesM110
packagingBulk
product statusActive
param 1Modem
param 2LTE
param 3168MHz
param 4General Purpose
param 5RS-232, USB
param 6-
param 7-
param 8-
param 9-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify M113F00FS Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For M113F00FS, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.