Home / Products / Lattice Semiconductor Corporation / ICE40LP1K-SWG16TR1K

Lattice Semiconductor Corporation ICE40LP1K-SWG16TR1K

IC FPGA 10 I/O 16WLCSP

Answer first: this page is a purchasing reference for the exact part number ICE40LP1K-SWG16TR1K from Lattice Semiconductor Corporation. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Lattice Semiconductor Corporation Part number: ICE40LP1K-SWG16TR1K Package: 16-XFBGA, WLCSP RFQ verification required

Key Parameters

Part NumberICE40LP1K-SWG16TR1K
ManufacturerLattice Semiconductor Corporation
CategoryFPGAs (Field Programmable Gate Array)
package16-XFBGA, WLCSP
seriesiCE40™ LP
packagingTape & Reel (TR)
product statusActive
param 1Not Verified
param 2160
param 31280
param 465536
param 510
param 6-
param 71.14V ~ 1.26V
param 8Surface Mount
param 9-40°C ~ 100°C (TJ)
param 10-
param 11-
param 1216-WLCSP (1.4x1.48)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify ICE40LP1K-SWG16TR1K Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For ICE40LP1K-SWG16TR1K, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.