Home / Products / FPGAs (Field Programmable Gate Array) / Lattice Semiconductor Corporation / OR2C12A4S240-DB

Lattice Semiconductor Corporation OR2C12A4S240-DB

FPGA, 324 CLBS, 15600 GATES

Answer first: this page is a purchasing reference for the exact part number OR2C12A4S240-DB from Lattice Semiconductor Corporation. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Lattice Semiconductor Corporation Category: FPGAs (Field Programmable Gate Array) Part number: OR2C12A4S240-DB Package: 240-BFQFP RFQ verification required

Key Parameters

Part NumberOR2C12A4S240-DB
ManufacturerLattice Semiconductor Corporation
CategoryFPGAs (Field Programmable Gate Array)
package240-BFQFP
seriesORCA™2
packagingBulk
product statusActive
param 1Not Verified
param 2-
param 31296
param 420736
param 5192
param 635800
param 74.75V ~ 5.25V
param 8Surface Mount
param 90°C ~ 70°C (TA)
param 10-
param 11-
param 12240-SQFP (32x32)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify OR2C12A4S240-DB Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For OR2C12A4S240-DB, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.