Home / Products / Coaxial Connector (RF) Adapters / LEMO / ASA.00.250.NTL

LEMO ASA.00.250.NTL

CONN ADAPT NIM-CAM JACK-SMA PLG

Answer first: this page is a purchasing reference for the exact part number ASA.00.250.NTL from LEMO. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: LEMO Category: Coaxial Connector (RF) Adapters Part number: ASA.00.250.NTL Package: RFQ verification required

Key Parameters

Part NumberASA.00.250.NTL
ManufacturerLEMO
CategoryCoaxial Connector (RF) Adapters
series00
packagingBulk
product statusActive
param 1Plug to Jack
param 2Between Series
param 3SMA to Nim-Camac CD/N 549
param 4Female to Male
param 5NIM-CAMAC CD/N 549 Jack, Female Socket
param 6SMA Plug, Male Pin
param 750 Ohms
param 8Straight
param 9Free Hanging (In-Line)
param 10-
param 11Push-Pull, Threaded
param 12-
param 13IP50 - Dust Protected
param 14Gold
param 15-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify ASA.00.250.NTL Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For ASA.00.250.NTL, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.