Home / Products / Lumberg Automation / 0985 YM57530 100/2M

Lumberg Automation 0985 YM57530 100/2M

CIRC CBL 4POS RCPT TO RCPT 6.56'

Answer first: this page is a purchasing reference for the exact part number 0985 YM57530 100/2M from Lumberg Automation. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Lumberg Automation Part number: 0985 YM57530 100/2M Package: RFQ verification required

Key Parameters

Part Number0985 YM57530 100/2M
ManufacturerLumberg Automation
CategoryCircular Cable Assemblies
series-
packagingBulk
product statusActive
param 1Receptacle
param 2Male Pins
param 34
param 4All
param 5M12
param 6D
param 7Free Hanging (In-Line)
param 8Receptacle
param 9Male Pins
param 104
param 11All
param 12M12
param 13D
param 14Free Hanging (In-Line)
param 156.56' (2.00m)
param 16Standard
param 17Round
param 18Thermoplastic Elastomer (TPE)
param 19Teal
param 20Shielded
param 21IP68 - Dust Tight, Waterproof
param 22Cat5e, Industrial Environments

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify 0985 YM57530 100/2M Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For 0985 YM57530 100/2M, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.