Home / Products / Ferrite Cores / Maanshan New Conda Magnetic Industrial Co.,Ltd. / EE130/63/40-LP3S

Maanshan New Conda Magnetic Industrial Co.,Ltd. EE130/63/40-LP3S

FERRITE CORE E LP3S 1PC

Answer first: this page is a purchasing reference for the exact part number EE130/63/40-LP3S from Maanshan New Conda Magnetic Industrial Co.,Ltd.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Maanshan New Conda Magnetic Industrial Co.,Ltd. Category: Ferrite Cores Part number: EE130/63/40-LP3S Package: RFQ verification required

Key Parameters

Part NumberEE130/63/40-LP3S
ManufacturerMaanshan New Conda Magnetic Industrial Co.,Ltd.
CategoryFerrite Cores
seriesE130/63/40
product statusActive
param 1E
param 2E 130 x 63 x 40
param 3LP3S
param 4-
param 512 µH
param 6±25%
param 7Ungapped
param 81868.0
param 92500
param 100.2
param 11294.0
param 121504.0
param 131494.0
param 14442337.0
param 15Uncoated
param 162.480" (63.00mm)
param 175.118" (130.00mm)
param 181.575" (40.00mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify EE130/63/40-LP3S Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For EE130/63/40-LP3S, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.