Home / Products / Ferrite Cores / Maanshan New Conda Magnetic Industrial Co.,Ltd. / EE160/83/40-LP9

Maanshan New Conda Magnetic Industrial Co.,Ltd. EE160/83/40-LP9

FERRITE CORE E LP9 1PC

Answer first: this page is a purchasing reference for the exact part number EE160/83/40-LP9 from Maanshan New Conda Magnetic Industrial Co.,Ltd.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Maanshan New Conda Magnetic Industrial Co.,Ltd. Category: Ferrite Cores Part number: EE160/83/40-LP9 Package: RFQ verification required

Key Parameters

Part NumberEE160/83/40-LP9
ManufacturerMaanshan New Conda Magnetic Industrial Co.,Ltd.
CategoryFerrite Cores
seriesE160/83/40
product statusActive
param 1E
param 2E 160 x 83 x 40
param 3LP9
param 4-
param 510.8 µH
param 6±25%
param 7Ungapped
param 82139.0
param 93300
param 100.25
param 11398.0
param 121600.0
param 131585.0
param 14637000.0
param 15Uncoated
param 163.268" (83.00mm)
param 176.299" (160.00mm)
param 181.575" (40.00mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify EE160/83/40-LP9 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For EE160/83/40-LP9, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.