Maanshan New Conda Magnetic Industrial Co.,Ltd. EE160/83/40-LP9
FERRITE CORE E LP9 1PC
Answer first: this page is a purchasing reference for the exact part number EE160/83/40-LP9 from Maanshan New Conda Magnetic Industrial Co.,Ltd.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | EE160/83/40-LP9 |
|---|---|
| Manufacturer | Maanshan New Conda Magnetic Industrial Co.,Ltd. |
| Category | Ferrite Cores |
| series | E160/83/40 |
| product status | Active |
| param 1 | E |
| param 2 | E 160 x 83 x 40 |
| param 3 | LP9 |
| param 4 | - |
| param 5 | 10.8 µH |
| param 6 | ±25% |
| param 7 | Ungapped |
| param 8 | 2139.0 |
| param 9 | 3300 |
| param 10 | 0.25 |
| param 11 | 398.0 |
| param 12 | 1600.0 |
| param 13 | 1585.0 |
| param 14 | 637000.0 |
| param 15 | Uncoated |
| param 16 | 3.268" (83.00mm) |
| param 17 | 6.299" (160.00mm) |
| param 18 | 1.575" (40.00mm) |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify EE160/83/40-LP9 Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For EE160/83/40-LP9, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.