Home / Products / Ferrite Cores / Maanshan New Conda Magnetic Industrial Co.,Ltd. / UU100/75/30-LP9

Maanshan New Conda Magnetic Industrial Co.,Ltd. UU100/75/30-LP9

FERRITE CORE U LP9 1PC

Answer first: this page is a purchasing reference for the exact part number UU100/75/30-LP9 from Maanshan New Conda Magnetic Industrial Co.,Ltd.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Maanshan New Conda Magnetic Industrial Co.,Ltd. Category: Ferrite Cores Part number: UU100/75/30-LP9 Package: RFQ verification required

Key Parameters

Part NumberUU100/75/30-LP9
ManufacturerMaanshan New Conda Magnetic Industrial Co.,Ltd.
CategoryFerrite Cores
seriesU100/75/30
product statusActive
param 1U
param 2U 100 x 75 x 30
param 3LP9
param 4-
param 58.5 µH
param 6±25%
param 7Ungapped
param 82613.0
param 93300
param 100.39
param 11354.0
param 12917.0
param 13917.0
param 14324620.0
param 15Uncoated
param 162.972" (75.50mm)
param 173.937" (100.00mm)
param 181.181" (30.00mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify UU100/75/30-LP9 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For UU100/75/30-LP9, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.