Home / Products / Power Management - Specialized / Monolithic Power Systems Inc. / MP26085DJ-LF-Z

Monolithic Power Systems Inc. MP26085DJ-LF-Z

IC BATT CHRG LI-ION

Answer first: this page is a purchasing reference for the exact part number MP26085DJ-LF-Z from Monolithic Power Systems Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Monolithic Power Systems Inc. Category: Power Management - Specialized Part number: MP26085DJ-LF-Z Package: SOT-23-8 Thin, TSOT-23-8 RFQ verification required

Key Parameters

Part NumberMP26085DJ-LF-Z
ManufacturerMonolithic Power Systems Inc.
CategoryPower Management - Specialized
packageSOT-23-8 Thin, TSOT-23-8
series-
packagingTape & Reel (TR)
product statusActive
param 1Battery Chargers
param 2200µA
param 37V ~ 20V
param 4-40°C ~ 85°C (TA)
param 5-
param 6-
param 7Surface Mount
param 8TSOT-23-8

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify MP26085DJ-LF-Z Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For MP26085DJ-LF-Z, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.